Erection steam turbine DT4, Austria
Client: Zellstoff Pöls AG, Pöls, Austria
Erection steam turbine DT4
150 GWh of green energy per year
Project
TBP received the order to integrate a new steam turbine into the existing steam distribution network of the pulp mill. This project was a co-operation with ENERTEC Naftz & Partner GmbH & Co KG, Graz, Austria (ENERTEC planning contract: process engineering assessment of the overall system, balancing, creation of process flow diagrams, basic engineering, RUI creation, CE certification).
Planning contract
- Detail-engineering for piping systems steam turbine, reduction and distribution as well as cooling water
- Auxiliary media
- Stress and component calculation
- Piping class calculation
- Steel construction planning
Project size
| Investment sum | approx. 35. Mio € |
Technical data
| Annual production of green electricity | 150 GWh |
| Steam turbine | |
| Output | 11 and 6 bar |
| Steam output | max. 150 t/h |
| Tapping | 35 bar |
| Condensate turbine | |
| Steam output | 68 bar |
| Steam pressure | 220 t/h |
| Steam temperature | 480° C |
| Products | Steam, Green electricity |
| Turbine type | Extraction (steam) and condensate turbine |
Implementation period
| Engineering | Aug 2009 - Apr 2010 |
| Start up | Apr 2010 |