Zellstoff Pöls AG - Pöls - 2010

Erection steam turbine DT4, Austria

Client: Zellstoff Pöls AG, Pöls, Austria

Erection steam turbine DT4

150 GWh of green energy per year



Project

TBP received the order to integrate a new steam turbine into the existing steam distribution network of the pulp mill. This project was a co-operation with ENERTEC Naftz & Partner GmbH & Co KG, Graz, Austria (ENERTEC planning contract: process engineering assessment of the overall system, balancing, creation of process flow diagrams, basic engineering, RUI creation, CE certification).


Planning contract

  • Detail-engineering for piping systems steam turbine, reduction and distribution as well as cooling water
  • Auxiliary media
  • Stress and component calculation
  • Piping class calculation
  • Steel construction planning


Project size

Investment sum                                  approx. 35. Mio €



Technical data

Annual production of green electricity    150 GWh
Steam turbine  
   Output 11 and 6 bar
   Steam output max. 150 t/h
   Tapping 35 bar
Condensate turbine  
   Steam output 68 bar
   Steam pressure 220 t/h
   Steam temperature 480° C
Products Steam, Green electricity
Turbine type Extraction (steam) and condensate turbine



Implementation period

Engineering                                       Aug 2009 - Apr 2010
Start up Apr 2010