Erection wheat starch and processing plant, Germany
Client: Südzucker AG, Mannheim, Germany
Erection wheat starch and processing plant, Zeitz factory
150.000 t/y net (Glucose syrup from wheat)
Project
TBP received the order for the erection of wheat starch plant as expansion of the existing sugar factory / bioethanol plant at Zeitz.
Wheat acceptance and stocking mill, wet starch pant, bran drying and stocking, starch sugaring, media supply (FW, KW, D, DL) and disposal (BARA).
Planning contract
- Project engineering and procurement engineering for the complete plant
- Process and plant engineering for the complete plant, i.e.
- Process, layout, piping, electrics, instrumentation and automation
- Building design for the complete plant (subcontractor BHM Ingenieure)
- Approval engineering for authority (package supplier for the main treats mill, wet starch, sugaring)
Project size
| Investment sum | 125 Mio € |
Technical data
| Glucose syrup production | 150.000 t/y |
| Wheat grinding capacity | 850 t/d |
| Bran grinding capacity | 300 t/d |
| Gluten production | 115 t/d |
| Wheat processing | 300.000 t/y |
| Products | Glucose syrup DE42, Hydrolyzate DE96 |
Implementaiton period
| Basic- and detail-engineering | Mar 2013 - Oct 2015 |
| Supervision of erection | Dec 2014 - Jan 2016 |
| Start up | Jan 2016 - Jun 2016 |
Related projects:
- Creation of technical documentation for ALE suppliers in Engineering Base (P00329)
- Detail-engineering piping wet starch plant (P00332)
- Detail-engineering of raw material packaging grain plant (P00335)
- Erection piping bridge from saccharification to WSP P00336)
- Integration of steam line from steam turbine Energy center 1 (P00464)
- Revision of logistics study (P00543)
- Erection trace heating cabinet for saccharification (P00631)
- CE documentation (P00684)