Serang - Indonesia - 1995

Erection 2 greenfield folding box board machines SPM3 and SPM4 - 3D piping engineering, Indonesia

Client: Machine supplier, Germany

3D piping engineering for erection 2 greenfield folding box board machines SPM3 and SPM4 in Indonesien

250.000 t/y net (per machine)



Project

TBP received the order as a subcontractor to make the 3D piping engineering for the new construction of 2 greenfield folding box board machines SPM3 and SPM4 (4-ply).


Planning contract 

  • Engineering for 3D piping engineering


Technical data

Production                                  500.000 t/y net (2 x 250.000 t/y per machine)
Product Board (Folding box board)


Implementation period

3D piping engineering                 May 1994 - Jun 1995
Start up Feb 1996