PLANTENGINEERING
SCA Graphic Laakirchen AG - Laakirchen - 2004
Study production increase PM11, Austria
Client: SCA-Graphic Laakirchen AG (now: Laakirchen Papier AG), Laakirchen, Austria
Study production increase PM11
Expansion 1. stage to 295.000 t/y net and 2. stage to 360.000 t/y net
Project
TBP received the order to carry out a study to determine the measures required to increase production fo the PM11 in two stages. The two stages of production increase can be achieved by increasing the PM speed without having to epand the PM11 itself. However, the auxiliary systems must be adapted and expanded for this.
Planning contract
- Study
- Overall coast catalogue
- Time scheduling
Technical data
| Production increase | |
| 1. stage | 295.000 t/y |
| 2. stage | 360.000 t/y |
| Product | Graphic papers (SC papers) |
| Production speed | |
| 1. stage | 1.400 m/min |
| 2. stage | 1.800 m/min |
Implementation period
| Study | 2004 |
Pre-project:
- Pre-project PM11 - Modification and extension (P3468)