Papierfabrik Fritz Peters GmbH & Co KG - Gelsenkirchen - 2004

Project study plant expansion and investigation of internal logistics processes, Germany

Client: Papierfabrik Fritz Peters GmbH & Co. KG
            (now: Hamburger Rieger Gelsenkirchen GmbH & Co. KG), Gelsenkirchen, Germany 

Project study plant expansion and investigation of internal logistics processes



Project

TBP received the order to dynamically simulate the plant's internal transport logistics and to identify bottlenecks for potential plant expansions. The model was created using ExtendTM.Project study plant expandation and investigation of internal logistics processes


Planning contract

  • Study for plant expansion (design of the physical warehouse management, design of the organisational structure, communication of the control system)
  • Logistics simulation in ExtendTM


Technical data

possible production increase        
   1. step from 170.000 t/y to 250.000 t/y net
   2. step from 250.000 t/y to 500.000 t/y net
Product

Packaging papers (recycled containerboard,
Plast board liner (20 % each white, brown liner))

Logistic simulation total 9 plant areas


Implementation period

Admission and documentation     Feb 2004 - May 2004