PLANTENGINEERING
Papierfabrik Fritz Peters GmbH & Co KG - Gelsenkirchen - 2004
Project study plant expansion and investigation of internal logistics processes, Germany
Client: Papierfabrik Fritz Peters GmbH & Co. KG
(now: Hamburger Rieger Gelsenkirchen GmbH & Co. KG), Gelsenkirchen, Germany
Project study plant expansion and investigation of internal logistics processes
Project
TBP received the order to dynamically simulate the plant's internal transport logistics and to identify bottlenecks for potential plant expansions. The model was created using ExtendTM.Project study plant expandation and investigation of internal logistics processes
Planning contract
- Study for plant expansion (design of the physical warehouse management, design of the organisational structure, communication of the control system)
- Logistics simulation in ExtendTM
Technical data
| possible production increase | |
| 1. step | from 170.000 t/y to 250.000 t/y net |
| 2. step | from 250.000 t/y to 500.000 t/y net |
| Product |
Packaging papers (recycled containerboard, |
| Logistic simulation | total 9 plant areas |
Implementation period
| Admission and documentation | Feb 2004 - May 2004 |