Norske Skog Bruck GmbH - Bruck / Mur - 2023

Project „STRATO" rebuilt paper machine PM3 - Detail-engineering, Austria

Client: Norske Skog Bruck GmbH, Bruck/Mur, Austria

Project „STRATO" rebuilt paper machine PM3 - Detail-engineering

210.000 t/y (after rebuilt)


Project

TBP received the order to convert the PM3 to testliner and fluting papers to increase production. The paper rolls produced in the PM3 are fed to a downstream winder and cut into suitable customer formats. The raw material for container production will be 100% old corrugated containers (OCC), for which purpose a new plant was built in the northern part of the site. In this context, the existing wastewater treatment plant had to be adapted. 


Planning contract

  • Pre-project phase / basic- and submission planning
  • Detail-engineering process / system / pipework 
  • Detail-engineering electrical / automation 
  • Development of schedules 
  • Procurement
  • Project organisation 
  • Mechanical / electrical / automation / site management 
  • Start up 
  • Documentation


Project size

Investment sum                                   approx. 120 Mio €


Technical data

Production after rebuilt                        210.000 t/y
Products Containerboard
Working width 5.350 mm

 

Implementation period

Start of engineering                             2021
Start of construction 2021
Start up Mar 2023