PLANTENGINEERING
Neusiedler AG - Ulmerfeld-Hausmening - 1995
Rebuilt paper machine PM6, Austria
Client: Mondi Business Paper Holding, Ulmerfeld-Hausmening, Austria
Rebuilt paper machine PM6
Increase from 120.000 t/y to 150.000 t/y net
Project
TBP received the order to rebuild the PM6 paper machine to increase capacity from 120,000 t/y to 150,000 t/y. The rebuild means changing from single-ply to three-ply toilet paper, using deinked paper as raw material for the middle ply. Establishment of the TRIOTEC® brand.
Planning contract
- Basic- and detail-engineering for all areas
- Project administration
- Erection of supervision
- Start up assistance
Technical data
| Production after rebuilt | 150.000 t/y |
| Products | Packaging paper (White Top Testliner) |
| Grammage | 50 - 120 g/m2 |
| Grammage woodfree | 80 g/m2 |
Implementation period
| Engineering | Sep 1993 - Jun 1995 |
| Project administration | Oct 1993 - Dec 1995 |
| Supervision of erection | Jun 1995 - Sep 1995 |
| Start up | Sep 1995 |