Mondi SCP a.s - Ruzomberok - 2021

Erection paper machine PM19, Slovakia

Client: Mondi SCP a.s., Ruzomberok, Slovakia

Erection paper machine PM19

300.000 t/y net


Project

TBP received the order for the new construction of PM19, including stock preparation, PM and winder, reel unwind, and automatic shipping store up to the wastewater treatment plant.


Planning contract

  • Purchasing
  • Basic-engineering
  • Detail-engineering incl. as-built images
  • Supervision of erection


Project size

Investment sum                                           approx. 340 Mio €

 

Technical data

Production                                                    300.000 t/y
Products


Packaging paper
(recycled containerboard (Testliner)
Kraft Top White)

Working width

5.400 mm

 

Implementation period

Basic-engineering and permitting              2016 - 2018
Detail-engineering incl. as-built images 2019 - 2021
Start up 2021


 

Related projects:


  • Site supervison BHM Ingenieure (P00834)
  • Instrumentation (P00836)
  • Steam and condensate pipeline (P00870)