Mannheim - Deutschland - 1988

Erection greenfield containerboard machine - E / I&C engineering, Germany

Client: Machine supplier, Germany

E / I&C engineering for erection greenfield containerboard machine in Germany 

310.000 t/y net (850 t/d net)



Project

TBP received the order as a subcontractor for the engineering of the measurement and control technology, electrical and control planning of the waste paper preparation for a new greenfield containerboard machine.


Planning contract

  • Engineering (Elektrical, measuring/control technology and control planning)


Technical data

Production                       310.000 t/y (850 t/d)
Product Packaging paper (recycled containerboard)



Implementation period

Engineering                      Feb 1988 - Aug 1988