Client: Laakirchen Papier AG, Laakirchen, Austria
Complete rebuilt paper machine PM10
450.000 t/y net (after complete rebuilt)
Project
TBP received the order for the complete rebuilt of PM10 into containerboard paper production based on recycled paper (100 % recovered paper). The aim was to achieve maximum reusability of the existing paper machine for uncoated paper.
The wood yard will be converted into a waste paper storage area.
Planning contract
- Basic-engineering
- complete system recording via laser grammetry
- Detail-engineering
- Environmental impact assessment
- Purchasing
- Supervison of erection
Project size
| Investment sum | approx. 100 Mio € |
Technical data
| Production after complete rebuilt | 450.000 t/y |
| Products |
Packaging paper (recycled containerboard (Wellenstoff, Testliner)) |
| Working width | 7.500 mm |
Implementation period
| Laser grammetry and detail-engineering | Jul 2016 - Aug 2017 |
| Start up | Oct 2017 |
Related projects:
- Preparation of specifications for ELS (energy control system) (P00536)
- Detailing cost catalog (P00573)
- Revision of technical standard (P00612)
- FAT test (P00698)