PLANTENGINEERING
Laakirchen Papier AG - Laakirchen - 2016
Submission planning „Renil PM10“ and expansion PM11, Austria
Client: Laakirchen Papier AG, Laakirchen, Austria
Submission planning “Renil PM10” and expansion PM11
350.000 t/y net (after expansion PM11) / 450.000 t/y net (after rebuilt PM10)
Project
TBP received the order for the rebuild of paper machine PM10 to liner as well as the removal of paper machine PM11. The scope of the expansion work includes the calender 5 (6/8 rolls), the hall crane for the extension, the adaptation of the RSM 3, the tamour cross transport, the connection to existing burners for roll heating, the adaptation of the hall ventilation, the adaptation of the edge trim suction system, and the adaptation of the workshop tract.
Planning contract
- Documents for the preliminary with authorities
- Basic-engineering
- Schedule planning
- Process engineering
- System engineering
- Electric-concept
- Automation and instrumentation concept
- Commercial submission planning “Renil PM10”
- Layouts
- Project description
- Emission layout
- Logistics
- Block diagram
- Consumption values
- Participation in meetings with authoritie
Project size
| Investment sum | approx. 100 Mio € |
| thereof expansion PM10 | approx. 6 Mio € |
Technical Data
| Production after expansion PM10 production line | 350.000 t/y |
| Products |
Packaging papers (recycled containerboard (Corrugating medium, Testliner)) |
| Trimed width according to PM | 7.500 mm |
| Stock preparation | 2-layer |
| Raw materials | 1.02 (B12); 1.04 (B19); 4.03 (W52) |
| Waste paper stock preparation capacity | 1.300 t/d (bone dry) |
| Storage for waste paper | 15.000 t/d (target value 20.000 t/d) |
| Stock of finished goods | 15.000 t/d SC paper |
Implementation period
| Documents for the preliminary with authorities | Feb 2015 - Apr 2015 |
| Basic-engineering and permitting documentation | Oct 2015 - Apr 2016 |
Follow-up project:
-
Complete rebuilt paper machine PM10 (P00572)