Project

TBP received the order for the entire plant engineering for the construction of a new biomass steam power plant with combined heat and power of 158 MW/thermal and 45 MW/electrical.


Planning contract

  • Project management and procurement for the entire plant
  • Process and plant planning for overall plant, i.e.

    • Process, layout, piping, electrical, instrumentation and automation
    • Construction planning for entire plant (by subcontractor BHM Ingenieure)
    • Authority engineering and submission (package suppliers for boiler and turbine)

 

Project size

Investment sum                                                         141 Mio €

 

Technical data      

Output 158 MW/thermal
    45 MW/electrical
Steam capacity 223 t/h
Steam pressure 112 bar
Steam temperature                                                     520° C
Products Steam, boiler circulation fluidized bed
Type of turbine Extraction and condensing turbine

 

Implementation period

Purchasing Mar 2012 - Dec 2012
Basic-engineering and submission planning              Jan 2013 - Dec 2013
Detail-engineering Oct 2013 - Mar 2015
Supervision of erection Dec 2014 - Jun 2015
Start up Jun 2015