EGGER Holzwerkstoffe Wismar GmbH & Co. KG - Wismar - 2023

Rebuilt glue factory, Germany

Client: EGGER Holzwerkstoffe GmbH & Co. KG, Wismar, Germany

Rebuilt glue factory

300.000 t/y net 


Project

TBP received the order for the conversion of the existing glue factory for OSB, MDF/HDF board and laminate flooring production in Wismar, Germany, in 3 expansion phases: 

Phase 1: Methanol tanks
Phase 2: Methanol tanks, glue storage, urea hall, pipe bridge and formaldehyde plant (connection of new pipe bridge)
Phase 3: Cooling towers, water tanks, impregnating resin storage, supply house and production

 

Planning contract

  • Basic- and Detail-engineering in den 3 above montioned stages of development
  • Stress calculation methanol pipeline S-80-ME-711-SS
  • 3D-laser scanning
  • Procurement of assembly trades


Project size

Investment sum                             45 Mio €



Technical data

Products                                      

Glue and impregnating resign for the production of
OSB and particleboard (uncoated and coated)


Implementation period

Engineering                                   2018 - 2023
Start up 2023
 

Related projects:

  • Ruilt glue factory - Piping static for methanol pipeline S-80-ME-711-SS (P00630)
  • Rebuilt glue factory - Laser scan, layout & schematic as-built images (P00687)
  • Rebuilt glue factory - Creation of 3D model as-built (P00798)
  • Rebuilt glue factory - Phase 2, mechanics and construction (P00838) 
  • Rebuilt glue factory - Laser scanning for routing impregnating resin, glue and steam line (P00883)