EGGER Holzwerkstoffe Wismar GmbH & Co. KG - Wismar - 2023
Rebuilt glue factory, Germany
Client: EGGER Holzwerkstoffe GmbH & Co. KG, Wismar, Germany
Rebuilt glue factory
300.000 t/y net
Project
TBP received the order for the conversion of the existing glue factory for OSB, MDF/HDF board and laminate flooring production in Wismar, Germany, in 3 expansion phases:
Phase 1: Methanol tanks
Phase 2: Methanol tanks, glue storage, urea hall, pipe bridge and formaldehyde plant (connection of new pipe bridge)
Phase 3: Cooling towers, water tanks, impregnating resin storage, supply house and production
Planning contract
- Basic- and Detail-engineering in den 3 above montioned stages of development
- Stress calculation methanol pipeline S-80-ME-711-SS
- 3D-laser scanning
- Procurement of assembly trades
Project size
| Investment sum | 45 Mio € |
Technical data
|
Products |
Glue and impregnating resign for the production of |
Implementation period
| Engineering | 2018 - 2023 |
| Start up | 2023 |
Related projects:
-
Ruilt glue factory - Piping static for methanol pipeline S-80-ME-711-SS (P00630)
-
Rebuilt glue factory - Laser scan, layout & schematic as-built images (P00687)
-
Rebuilt glue factory - Creation of 3D model as-built (P00798)
-
Rebuilt glue factory - Phase 2, mechanics and construction (P00838)
-
Rebuilt glue factory - Laser scanning for routing impregnating resin, glue and steam line (P00883)