Dr. Franz Feurstein Gesellschaft m.b.H. - Traun - 2004
Erection paper machine PM3, Austria
Client: Dr. Franz Feurstein Gesellschaft m.b.H., Traun, Austria
Erection paper machine PM4
35.000 t/y net
Project
TBP received the order for the basic- and detailed-engineering of a new production plant for the manufacture of fine papers. The work covered pulp storage, stock preparation (filler, additives and chemical preparation from filling to dosing point, dissolving of foreign pulp, refining), PM and RSM, auxiliary systems in the production buildings as well as electrics, medium and low-voltage systems, measurement and control technology and automation.
Planning contract
- Basic- and detail-engineering
- Process planning according to the client's specifications
- Plant and E / I&C planning for stock preparation and PM, operating and auxiliary material preparation, ancillary plants
- Procurement engineering (excluding PM and RSM)
- Pipeline planning
- Supervision and commissioning planning
- Supervision of erection
- CE certification
Project size
| Investment sum | 100 Mio € |
Technical data
| Production | 35.000 t/y |
| Products |
Specialty papers (Tipping papers, Fine papers) |
| Working width | 5.000 mm |
Implementation period
| Engineering | May 2003 - Oct 2004 |
| Supervision of erection | Jul 2004 - Dec 2004 |
| Start up | Dec 2004 |