Agrana Zucker GmbH - Tulln - 2018

Layout study conversion unloading beet yard, Austria

Client: Agrana Zucker GmbH, Tulln, Austria

Layout study conversion unloading beet yard 


Project

TBP received the order for a study to convert the beet conveyor system after rail unloading to a beet pump and to convert the north beet storage area for peak coverage in the morning hours (north side) to provide a truck self-unloading area. About 50 % of the beet volume is unloaded on average via each of the two parallel beet unloading systems.


Planning contract

  • Layout study
  • Investment coast calculation


Technical data

Current beet processing capacity                      14.000 - 15.000 t/d
Truck:  
    Beet quantity per delivery 50 %
    Condition dry
Railroad:  
    Beet quantity per wagon 40 - 45 t
    Condition wet
Earth attachment (pollution) approx. 10 - 15 %
Products Sugar beets

 

Implementation period

Study                                                                   2018