Agrana Zucker GmbH - Tulln - 2019
Rebuilt plant Tulln, Austria
Client: Agrana Zucker GmbH, Tulln, Austria
Rebuilt plant Tulln
Project
TBP received the order for the conversion of the existing chemical storage for the storage of concentrated sulfuric acid and hydrochloric acid. This includes the frost-proof design of the emergency shower as well as the renewal for the truck unloading. Two new press chamber filters (PKF) were also installed to dewater sludge juice from the existing juice purification system, and the existing molasses filtration system was expanded to include a new precoat filter.
Planning contract
- Basic-engineering and submission planning
- Detail-engineering
- Supervision of erection
- Start up assistance
Technical data
| Storage quantity hydrochloric acid (30 - 33 %) | 44 t (density 1,16) |
| Bearing type | 2 external tanks |
| Storage quantity sulfuric acid (96 %) | 75 t (density 1,84) |
| Bearing type | 2 external tanks |
| Products | Hydrochloric acid, Sulfuric acid |
Implementation period
| Engineering | 2018 |
| Supervision of erection and start up planning | 2019 |
| Start up | 2019 |
Related projects:
- Chemical storage (P00633)
- Procoat filter molasses desugaring (P00703)
- Chemical storage execution plan (P00760)