Agrana Stärke GmbH - Pischelsdorf - 2019
Client: Agrana Stärke GmbH, Pischelsdorf, Austria
Erection weath starch plant WSA II
Increase to 650.000 t/y net (processing capacity)
Project
TBP received the order to expand the existing wheat starch plant (WSA I) in an easterly direction by adding a slightly larger second plant (WSA II). The existing raw material and finished goods storage facilities were expanded. An additional B-/C-slurry evaporation plant was built for the existing WSA I and WSA II, including integration into the existing RTO plant as well as the expansion of the wastewater treatment plant and a new steam boiler plant fed by the existing MS plant. The electrical power supply is provided by additional 20 kV cables from EVN Trafo and a cross connection to WSA I was made.
Planning contract
- Basic-engineering
- Detail-engineering
- Supervision of erection
- Start up
Project size
| Investment sum | 100 Mio € |
Technical data
| Production increasing | 650.000 t/y |
| Wheat starch | 260.000 t/y |
| Wheat gluten | 50.000 t/y |
| Wheat bran | 35.000 t/y |
| Wheat gluten feet | 100.000 t/y |
| Products |
Wheat starch, Wheat gluten, Wheat bran, Wheat gluten feet, |
Implementation period
| Basice-ngineering | 2017 |
| Detail-engineering | 2017 - 2018 |
| Supervision of erection | 2018 - 2019 |
| Start up | Sep 2019 |
Related projects:
- Engineering and submission planning for expansion WSA silo plant starch and gluten (P00647)
- Documentation barrier water conversion (P00669)
- Engineering for nozzel separator (P00670)
- E / I&C operations (P00885)